Application of One Bay Urban Renewal, LLC Redevelopment Plan for Medical Office Building
- Site Layout Exhibit, 1 sheet, prepared by Bohler Engineering, revision dated April 17, 2018.
- Aerial Exhibit, 1 sheet, prepared by Bohler Engineering, revision dated March 26, 2018 and Photo Exhibit, 1 sheet, prepared by Bohler Engineering, revision dated March 26, 2018.
- Exterior Rendering-Southwest View, 1 sheet, prepared by NK Architects, revision dated April 9, 2018.
- Construction Detail of Canopy, 1 sheet, prepared by NK Architects, revision dated January 31, 2018.
- Construction Detail of Facade, 1 sheet, prepared by NK Architects, revision dated January 31, 2018.
- Planning Board Engineer's Report, 2 pages, prepared by W. Thomas Watkinson Engineering & Planning, dated March 22, 2018.
- Planning Board's Parking Consultant Review, 2 pages, prepared by Level G Associates, dated March 22, 2018.
- Planning Board Traffic Engineer's Report, 5 pages, prepared by NV5, dated March 21, 2018.
- Glen Ridge Historic Preservation Commission Report, 1 page, dated March 6, 2018.
- Traffic Impact Analysis, prepared by Atlantic Traffic & Design, revision dated March 15, 2018.
- Traffic Signal Warrants Analysis, prepared by Atlantic Traffic & Design, dated October 13, 2017.
- Traffic Signal Plan, 1 sheet, prepared by Atlantic Traffic & Design, revision dated March 15, 2018.
- Truck Turn Plans, 4 sheets, prepared by Atlantic Traffic & Design, dated March 15, 2018.
- Utility Impact Analysis, prepared by Bohler Engineering, dated November 2017.
- Architectural Drawings, 8 sheets, prepared by NK Architects, revision dated January 31, 2018.
- Operations & Maintenance Manual, prepared by Bohler Engineering, dated March 15, 2018.
- Site Plan and Details, 17 sheets of drawings, prepared by Bohler Engineering, revision dated March 15, 2018.
- Boundary & Topographic Surveys, 5 sheets, prepared by Control Point Associates, Inc., dated January 17, 2018.
- Stormwater Management Report (with attachments), prepared by Bohler Engineering, dated October 2017.
- Planning Board Planner's Report, 23 pages, prepared by Janice Talley, dated February 23, 2018.
- Planning Board Engineer's Report, 2 pages, prepared by W. Thomas Watkinson Engineering & Planning, dated February 12, 2018.
- Planning Board Traffic Engineer's Report, 3 pages, prepared by NV5, dated February 12, 2018.