Site Plan Application of Montclair Hospital, LLC Redevelopment Plan for Parking Area
- Planning Board Traffic Engineer's Report, 3 pages, prepared by NV5, dated April 22, 2018.
- Overall Parking Layout, 1 sheet, prepared by Bohler Engineering, revision dated March 15, 2018.
- Site Layout Plan A, prepared by Bohler Engineering, revision dated April 17, 2018.
- Site Layout Plan B, prepared by Bohler Engineering, revision dated April 17, 2018.
- Sign Plan, prepared by Philadelphia Sign, dated April 9, 2018.
- Planning Board Engineer's Report, 1 page, prepared by W. Thomas Watkinson Engineering & Planning, dated March 22, 2018.
- Planning Board Planner's Report, Wayfinding Sign Plan, 8 pages, prepared by Janice Talley, dated March 20, 2018.
- Planning Board Traffic Engineer's Report, 2 page, prepared by NV5, dated March 21, 2018.
- Sign Plan, prepared by Brand Active, dated March 16, 2018.
- Traffic Impact Study Letter, prepared by Atlantic Traffic & Design, dated March 15, 2018.
- Operations & Maintenance Manual, prepared by Bohler Engineering, dated March 15, 2018.
- Valet Management Plan.
- Site Plan and Details, 22 sheets of drawings, prepared by Bohler Engineering, revision dated March 15, 2018.
- Boundary & Topographic Surveys, 5 sheets, prepared by Control Point Associates, Inc., dated July 11, 2016.
- Preliminary Geotechnical Investigation & Stormwater Management Area Evaluation, prepared by Whitestone Associates, Inc, dated February 5, 2015.
- Planning Board Planner's Report, 24 pages, prepared by Janice Talley, dated February 26, 2018.
- Planning Board Engineer's Report, 2 pages, prepared by W. Thomas Watkinson Engineering & Planning, dated February 23, 2018.
- Planning Board Traffic Engineer's Report, 1 page, prepared by NV5, dated February 26, 2018.